Xinsheng Hydropower Station was build in 1982 with 5 units 320kw Propeller type.
It is built on the tunnel on the source of the drinking water of Chengdu city, which requires strictly requirement of the oil control.
The origional requirement of the owner is to generator 430kw per unit, but after the design of DSSD, it could generate 485kw per hour. The project also brought a high reputation of us. Thus the owner offered us an extra amout of money for praise.
H:7.5m Flow:5×8.3m³/s
ZD***419-LH-120 SF500-20/1730
situation | origin | requirement | final |
output | 320kw | 430kw | 485kw |